The world's AI infrastructure, on one globe

Gridvara maps the physical footprint of the AI buildout — every tracked data center and GPU cluster, sized by power draw, from megawatt research clusters to gigawatt frontier campuses.

522tracked facilities
13.7 GWof IT power
13.7MH100-equivalents
38countries
scroll
Overview

What is Gridvara?

Gridvara is an interactive atlas of AI computing infrastructure. Each point on the 3D globe is a physical facility — who owns it, who uses it, how many chips it runs, how much power it draws, and what it cost to build. The largest frontier campuses have full profiles with construction timelines, hardware breakdowns, and Epoch AI's projections of where they're headed.

The data comes from Epoch AI's open Frontier Data Centers and GPU Clusters databases (CC-BY 4.0), built from satellite imagery, construction permits, and public disclosures. Epoch estimates this covers roughly 15–20% of global AI compute — the real buildout is larger still.

A gigawatt of AI compute costs about $38 billion and takes two years to build.
Gridvara tracks 13.7 GW of it — across 522 facilities in 38 countries.
The buildout race

Eight campuses, climbing

Each line is one frontier campus's IT power over time. Solid where Epoch AI has observed capacity; dashed where the line runs into projections of announced expansion.

The steepness is the story: capacity that took the cloud industry a decade to assemble is now added by single sites in quarters.

Dashed segments are projections from Epoch AI's Frontier Data Centers database.
Who owns the compute

A handful of buyers

Tracked IT power grouped by the company that owns or is the primary user of each facility. "Others" collects every operator below the frontier tier — hundreds of smaller research and cloud clusters.

The largest five operators account for 77% of all IT power Gridvara tracks.Computed from Epoch AI open data
The map is redrawn every quarter.
Below: the most recent construction milestones Epoch AI has recorded across every tracked frontier campus.
Latest milestones

What just happened

Dated events from campus construction timelines — status changes and step increases in power. Each links to the full profile.

Featured

The largest AI campuses

Ranked by current IT power. Switch country to see where each grid is carrying the load.

Colossus 2SpaceXAI · United States
946 MWexpanding
Anthropic-Amazon New CarlisleAmazon · United States
910 MWexpanding
Microsoft Fairwater AtlantaMicrosoft · United States
636 MWcurrent
Meta PrometheusMeta · United States
631 MWexpanding
OpenAI Stargate AbileneOracle · United States
421 MWexpanding
Microsoft Fairwater WisconsinMicrosoft · United States
369 MWexpanding